LEM is mandated as a coordinator for the technical studies that will provide an update on the re-qualification possibilities of the church as a venue for performing arts.

The studies include :
  • 3D indoor and outdoor building scanning
  • heritage study - inventory of architectural and decor components and qualitative analysis
  • acoustic study
  • characterization of materials
  • a study on the electrical capcity of the building
  • a study on bringing the building up to standards
  • an update of the building's health log