The first phase of the project was completed right on time before the reopening of the theater on February 22, 2018. LEM was responsible for the construction management of this project which included:
  • A new ticket office
  • Redesign of the bar and fireplace area
  • Integration of a manlift and an accessible restroom
  • Redesign of the public restrooms located in the basement
  • Addition of an interior structure to accommodate a larger management area
Architects
FABG
Engineers
Tetra Tech
Years
2017-2018